Case Study · IMO 9321483
DRAG TO REVEAL
◀ ▶
Yard Capabilities
Operating on tidal mudflats with full hard-standing and impermeable containment. Capacity: 6 vessels simultaneously. Annual throughput: 180,000 LDT.
Full inventory of hazardous materials against the ship's IHM. Asbestos mapping, PCB sampling, and pre-dismantling risk classification completed within 72 hours of anchorage.
Engineer-approved block-by-block dismantling sequence optimised for steel recovery yield and structural safety. Plans submitted to flag state and classification society before first torch.
Direct contracts with steel mills, copper refiners, and certified hazmat processors. Revenue per LDT reported to shipowner within 7 days of each material batch dispatch.
Statement of Completion, Green Recycling Certificate, and full waste manifest issued under Hong Kong Convention and EU SRR. Audit-ready documentation within 14 days of plot clearance.

MV Pacific Dawn
GRT: 82,340 · 298m LOA · Single Hull · Flag: Panama
A straightforward single-hull decommission. No asbestos above threshold, IHM complete, flag state documentation clean. Arrived March 2025, plot cleared July 2025 — 112 days, zero incidents.
Recovered Materials · Data Log
Project Lifecycle

MV Iron Atlas
GRT: 91,200 · 292m LOA · Double Hull · Flag: Marshall Islands
Nineteen cargo holds, asbestos insulation in engine room lagging above threshold, PCB-containing electrical equipment. Full hazmat extraction protocol before cutting commenced. 134 days, one near-miss logged and closed.
Recovered Materials · Data Log
Project Lifecycle
MV Seabird Express
GRT: 14,200 · 174m LOA · 1,200 TEU · Flag: Liberia
Complex decommission due to 84 refrigerated container units containing legacy refrigerants. All R-22 and R-404A refrigerants extracted under EPA protocol. Copper from reefer compressors added significant non-ferrous yield.
Recovered Materials · Data Log
Project Lifecycle

FPSO Meridian
GRT: 58,400 · 247m LOA · FPSO Unit · Flag: Bahamas
The most complex decommission in our yard's history. Asbestos in 340 identified locations, legacy crude residues requiring slop tank cleaning, radioactive scale (NORM) in production piping, and 12 tonnes of PCB-containing transformers. 198 days. Every item traceable.
Recovered Materials · Data Log
Project Lifecycle
Compliance Officers & P&I Clubs
Download our Green Recycling Certificate sample — the same document we issue under Hong Kong Convention and EU SRR. Formatted for EU Taxonomy audit, P&I club review, and ESG reporting. No vessel commitment required.